Installation of New Service Connection

About the Service
Installation for new service connection from service line to water meter shall be done only by authorized personnel of SMWD. Installation is completed within 8 hours for ordinary tapping and 1-2 days for road crossing. The concessionaire will then be responsible for the pipeline connections after the water meter. Payment or charges for the restoration of damaged road pavement in connection with tapping of new service connection shall be the liability of the concerned concessionaire.

 

Requirement
Current year Community Tax Certificate (Cedula) or any Government Issued I.D. 
Proof of Payment (O.R.) for new service connection

 

Availability of the Service
Daily except during Saturdays and Sundays, Holiday
8AM – 12Noon and 1PM – 5PM

Fees
Cost of Materials*
Miscellaneous Charges

  • Tapping Fee
    • Ordinary Tapping       P300.00
    • Road Crossing       P600.00
  • Application Fee       P100.00
  • Subscription Fee       P100.00

* varies depending on the location of service line to the distribution line. Calculated after site evaluation was conducted

 

 

How to Avail of the Service

Procedure Time Frame Personnel In-Charge
1. Present the agency accomplished breakdown of installation charges, certification from maintenance personnel, to the cashier for payment 5 – 30 mins Ms. Gemma R. Rosal
2. Obtain Official Receipt for the payment made. 5 – 10 mins. Ms. Gemma R. Rosal
3. Proceed to Mr. Gil Paje for contract signing 5 – 10 mins. Mr. Gil F. Paje
Ms. Genoveva L. Paje
4. Acknowledgement on the Job Order
Upon completion of the installation procedure, the concessionaire must affix his signature on the Job Order slip. This serves as proof that the job was actually performed and completed.